Home Builder developer florida general contractor luxury home
builders home remodeling contractor ho
bathroom kitchen
remodeling contractor & modular home construction
company Laying Out The Site and Building the foundation
Install temporary power and have electricity hooked up. Lay out
site, install batter boards, dig foundation trenches and install
the foundation forms. Pour footings, build foundation walls and
piers, and install mud sills. Have the foundation inspected.
Setting House UnitsWork crews lift components by crane onto the
foundation. RoofingInstall knee boards, collar ties and rafter
supports. Install gable end walls, structure wood and supports.
Install roof vents. Install roof underlayment and shingles on
hinge rows. Install ridge cap shingles. DormersIf applicable,
cut out roof, install dormer walls, trusses, roof decking, roof
edge, tar paper, roll roofing in valleys, install shingles,
metal flashing on front wall, install windows and finish trim.
Exterior Complete installation of exterior siding and trim,
soffit and fascia. install windows in gable ends. Paint exterior
doors and door jambs. Install shutters and optional exterior
storm/security doors. Install landscaping. Complete Plumbing,
Wiring and Utility HookupsInstall any under floor mechanicals,
under floor plumbing and electrical work. Complete electrical
hookup throughout home. inspect pipelines below or through the
foundation. Provide plumbing connections for water and heater
throughout home. Install exterior water faucets. Cut dryer vents
through floor and the exterior of the house. Inspection of
plumbing and wiring. Provide electrical service from power
company. Have electric, gas and water utilities turned on.
Heating and CoolingInstall heating and air conditioning systems.
Inspection of heating and air conditioning systems.
Steps, Porches, Decks, Driveways and SidewalksInstall steps,
porches, decks, driveways and sidewalks where applicable.
InteriorFinish interior wall and ceiling drywall repairs and
painting. Complete installation of archway and casing. Install
stairway walls, drywall, and stair rails to second floor and
paint, where applicable. Finish flooring, carpet to carpet
splice, carpet to tile splice. Finish installing interior doors
and trim. Finish installing light fixures and ceiling fans.
Finish installing shower doors, appliances and accessories.
CompletionClean up site outside and clean inside. Provide
grading and seeding of disturbed land areas. Have the final
inspection and secure certificate of occupancy. Move in.
http://www.floridahomebuild.com