Building Your Dream Home - Part 2
Razing the Cottage
With new house plans and permits in hand, subcontractors hired
and a Septic Design in process, it was now time to raze the
existing cottage. I considered employing the local fire
department to burn it down, however I chose the demolition route
instead. Though I did not contact the Fire Department, I was
convinced that this route would have led to multiple delays and
pitfalls, as I would have been at the whim of several town
employees and weather conditions. The demolition route required
only the excavator subcontractor and had less weather related
schedule risks. In addition, the demolition cost and effort was
very reasonable. Within two days, it was as if the cottage never
existed on the land. It is important to note, however, that the
cottage was relatively small. It was 22